Central supervisory system – Siemens WinCC Unified

Carried out as a subcontractor for SIPRA d.o.o.

Central supervisory system for monitoring and controlling:

  • the complete heating and ventilation system
  • lighting and roof flaps
  • room temperatures, with monitoring and logging
  • energy consumption at approx. 100 metering points (machine tools, robot cells, lighting), with measurement, display and analysis
  • archiving of current values to an SQL database
  • PDF and XLSX reports on machine utilisation, electricity consumption, gas consumption …
  • detailed alarming for all critical system components

The core of the system consists of 9 Siemens S7-1500 controllers with Siemens ET 200SP distributed I/O and a SCADA system built with WinCC Unified (TIA Portal V18).

This is an ongoing project: since commissioning, we have continuously been upgrading and extending the system with new functions.

Gallery (9)

↑ Back to list
2016–2023

Machine-vision correction system for a CNC sewing machine

Carried out as a subcontractor for Procesi d.o.o.

The project extends the base software of a CNC machine that sews decorative stitching onto leather parts.

Cameras are used to determine CNC program correction factors for each individual part relative to a reference program: origin offsets in X and Y, rotation angle, and scaling in X and Y.

The PC application communicates with the controller through a dedicated USB interface that captures key process signals and passes commands to the base application.

Since the software was developed and tested in 2016, we have installed it on 10 machines.

Gallery (3)

↑ Back to list
2019, 2020

Retrofit of hardening furnaces

Carried out as a subcontractor for Elpro Lepenik & Co. d.o.o.

The furnaces are used in pairs. The first heats the load gradually and then holds it at a set temperature (heating curve). After heating, the baskets with the parts are quenched in a cooling medium for a defined time.

The second furnace is used for artificial ageing: the parts are heated to a set temperature that must be held within 3 °C throughout the entire furnace volume (approx. 5 m³). The particular challenge was control across 6 zones within a single chamber – each zone has its own heaters and sensor, and the heaters of one zone also affect the temperature of the others.

Process data is written to a local server via a data logger.

Work performed

  • retrofit of the control cabinets and rework of the heating system of 4 furnaces
  • control system design and component selection
  • electrical drawings and cabinet layout
  • rework of the cabinet doors and new mounting plates (laser cutting, welding, painting – HORA MG d.o.o.)
  • cabinet wiring, installation and wiring on the machine (EMAT s.p. and Elektro3000 s.p.)
  • supply and installation of temperature sensors, calibration and correction of measurements in the chamber (Elpro Lepenik & Co. d.o.o.)
  • PLC program development and operator panel application
  • user manual

Equipment

  • Siemens S7-1500 PLC with additional I/O modules
  • Siemens 9-inch operator panel
  • Siemens switching, protection and indicator components
  • Advanced Energy solid-state relays (SSR)
  • temperature sensors by Elpro Lepenik & Co. d.o.o.
  • LAPP cables and wires
  • Weidmüller terminals, connection material and protective conduits
  • eWON Cosy module for remote monitoring and service

Gallery (9)

↑ Back to list
2018, 2019

Central building supervisory system – Siemens WinCC Professional

Carried out as a subcontractor for Procesi d.o.o.

The central supervisory system monitors and controls the complete heating and cooling system of office and production premises covering more than 20,000 m². It provides room temperature and humidity monitoring, weekly setpoint schedules, automatic shutdown temperatures, frost protection and detailed alarming for all critical system components.

The main control cabinet is located in the boiler room and communicates with 6 sub-cabinets in different parts of the plant. The boiler room can also be operated from the operator panel on the main control cabinet.

Work performed

  • involvement in control system design and advice on component selection
  • PLC program development and Modbus TCP communication with boilers and heat pumps
  • SCADA application on a PC workstation and an application for the 12-inch operator panel for local boiler room control
  • approx. 800 working hours for the supervisory system

Equipment

  • Siemens S7-1500 PLC and 6 distributed I/O stations
  • Siemens 12-inch panel for local boiler room control
  • Siemens WinCC Professional SCADA on a PC workstation

Gallery (6)

↑ Back to list
2015–2018

Retrofit of roller cutting presses

Carried out as a subcontractor for Procesi d.o.o.

The machines cut leather goods parts by rolling over cutting dies placed on the leather. The aim was to completely renew the worn-out electrical and pneumatic systems, as the machine frames were still in very good condition, well maintained and refined over the years.

We replaced all electrical cables and wires, renewed the complete pneumatic piping, replaced individually controlled valves with Profinet valve terminals, replaced the energy-hungry vacuum pump with far more efficient vacuum ejectors, and replaced contactor control of the two-speed wheel drive motors with frequency converters.

Work performed

  • 7 machines retrofitted, 3 in Slovenia and 4 in Croatia
  • control system design and selection of all control components
  • cable selection and sizing
  • electrical drawings and layout of the main and auxiliary control cabinets
  • cabinet wiring (in-house and EMAT s.p.)
  • replacement of all cables and cable trays (EMAT s.p.)
  • installation and wiring of the machines
  • replacement of the push-button console with a 12-inch touch panel
  • PLC program development and operator panel application
  • user manual
  • approx. 500 working hours for the first machine, approx. 300 hours per machine for the rest

Equipment

  • Siemens S5 controller replaced with a Siemens S7-1500
  • Siemens ET 200SP expansion modules in the control cabinet
  • Siemens ET 200AL distributed I/O on the machine
  • Siemens motor protection circuit breakers
  • Siemens 12-inch operator panel
  • SMC pneumatic valve terminals controlled via Profinet
  • SMC energy-saving vacuum ejectors
  • SMC pneumatic tubing, fittings, air preparation units …

Gallery (11)

↑ Back to list
2017, 2018

Temperature control of a liquid magnesium dosing nozzle

Client: Dynamic Metal Systems R&D GmbH (Graz)

The control system provides precise control of five zones heated by electric band heaters and one air-cooled zone on a nozzle for dosing liquid magnesium. Process data is stored locally on a USB stick.

Work performed

  • control system design and selection of all control components
  • electrical drawings and cabinet layout
  • cabinet wiring (EMAT s.p.)
  • PLC program development and operator panel application
  • user manual

Equipment

  • Siemens S7-1200 PLC with additional I/O modules
  • Siemens 9-inch touch panel
  • remote access via an eWON router

Gallery (4)

↑ Back to list
2014–2016

Municipal sewage sludge treatment plant

Carried out as a subcontractor for MZK Elektro d.o.o.

Sewage sludge from wastewater treatment plants is mixed with ash in a precisely defined ratio (heavy metal stabilisation). The end product can be deposited in the environment (waterproof capping of landfills, cores of flood embankments …).

Work performed

  • control system design and selection of all control components
  • cable selection and sizing
  • electrical drawings and layout of the main control cabinet and 5 sub-cabinets
  • cabinet wiring
  • supervision of on-site installation and wiring
  • PLC program development and process visualisation on the operator panel
  • user manual
  • approx. 1,000 working hours over 10 months

Equipment

  • S7-1200 controller with ET 200SP expansion modules
  • Siemens Comfort operator panel
  • Siemens G120 frequency converters
  • Siemens 3RA61 and 3RM12 motor starters
  • Siemens SITRANS LG260 radar level transmitter
  • Weidmüller terminals and connection material
  • Schrack control cabinets
  • LAPP cables and wires
  • eWON Cosy module for remote monitoring and service

Gallery (6)

↑ Back to list
2015, 2016

Retrofit of bridge cutting presses

Carried out as a subcontractor for Procesi d.o.o.

The presses cut parts for leather seat covers by pressing cutting dies placed on the leather with a hydraulically driven bridge. Particular attention was paid to operator safety, as the press applies a force of 2 MN (200 tonnes), and to control of the bridge stroke height.

Work performed

  • retrofit of three machines with worn-out controls
  • control system design and component selection
  • electrical drawings and cabinet layout
  • cabinet wiring (EMAT s.p.)
  • sandblasting and painting of the machine, replacement of all critical bolts (Jožef Tilli s.p.)
  • installation and wiring on the machine
  • PLC program development and operator panel application
  • user manual

Equipment

  • Siemens S7-1200 PLC with additional I/O modules
  • Siemens 7-inch operator panel
  • Siemens motor protection circuit breakers and motor starters
  • Siemens soft starter for the hydraulic pump
  • Di-soric safety controller
  • Weidmüller terminals, connection material and protective conduits
  • Rittal control cabinet
  • LAPP cables and wires

Gallery (6)

↑ Back to list
2015, 2016

Upgrade of a hot stamping machine

Carried out as a subcontractor for Procesi d.o.o.

The machine hot-stamps lettering into leather (e.g. AIR BAG, manufacturer logos …). The control system regulates the temperature of the platen (bottom) and the stamping head (top) according to the entered work order (entered with a QR code scanner). Data is sent to a database on a local server.

Work performed

  • design of the electrical control modifications to an existing new machine according to customer requirements
  • electrical drawings and cabinet layout
  • cabinet rewiring
  • PLC program development and operator panel application
  • user manual

Equipment

  • Siemens S7-1212C PLC with additional I/O modules
  • Siemens KTP1000 10-inch operator panel
  • SMC pressure regulator with analogue control

Gallery (4)

↑ Back to list
2014

Welding wire winding machine

Carried out as a subcontractor for SMB, Matjaž Brglez, s.p.

Winding of welding wire with a diameter of 0.54–1.6 mm with a precisely defined number of layers and turns per layer, without overlapping turns. The wire is rewound from a spool of approx. 60 cm diameter onto spools of approx. 10 cm diameter at approx. 5 m/s.

Work performed

  • electrical and pneumatic control design
  • electrical and pneumatic drawings
  • control box wiring and machine wiring
  • PLC program and operator panel
  • user manual
  • approx. 450 working hours

Equipment

  • Siemens S7-1200 PLC with additional I/O modules
  • Siemens KTP400 4-inch panel
  • spindle drive with an Emerson frequency converter
  • feed axis driven by a CoolMuscle closed-loop stepper motor controlled by Step/Direction signals

Gallery (6)

↑ Back to list
2013

Winding machine for spiral ice conveyors for refrigerators

Carried out as a subcontractor for SMB, Matjaž Brglez, s.p.

Winding of spiral ice conveyors from 8 mm stainless steel rods (various lengths and numbers of turns).

A linear servo axis follows the rotation angle of the drive spindle, based on numerical data from 3D drawings approximated with polynomial functions.

Work performed

  • electrical control design and component selection
  • program for the linear servo axis to follow the spindle (approximation of 3D drawing data with polynomial functions)
  • electrical and pneumatic drawings
  • control box wiring and machine wiring
  • PLC program and operator panel
  • drawings and user manual
  • commissioning, testing and optimisation of the machine
  • approx. 140 working hours

Equipment

  • Siemens S7-1200 PLC with additional I/O modules
  • Siemens KTP400 4-inch operator panel
  • spindle drive with an Emerson frequency converter on Profinet
  • feed axis with an Emerson servo drive controlled by Step/Direction signals

Gallery (3)

↑ Back to list
2013

Gas meter test rig

Gas meter housings are tested by immersion in water and a pressure test. The housing is placed in a specially shaped clamping head, where a pneumatic cylinder seals one port while compressed air is supplied to the other. The housing is automatically filled with air to a preset pressure, then a flap opens and a transparent tank filled with water rises to immerse the meter. Any leakage is checked visually (air bubbles) and with a pressure gauge.

Work performed

  • electrical and pneumatic control design
  • electrical and pneumatic drawings
  • control box wiring and machine wiring
  • PLC program
  • user manual
  • approx. 80 working hours

Equipment

  • Siemens LOGO! with additional I/O modules
  • SMC pressure switch with LED display
  • Hydex pneumatic cylinders and valves

Gallery (2)